久久精品国产WWW456C0M,麻豆亚洲AV成人无码久久精品,无码人妻丰满熟妇啪啪区日韩久久,中文字幕被公侵犯的漂亮人妻

[Skills and requirements for cooling tower purchase]
Release date:[2021/8/19] Is reading[318]次

The cooling tower is precisely selection to the cooling tower when purchasing, and the correct selection option can be performed after calculating the cooling water amount, cooling capacity, and power and other parameters. There are a variety of production materials of the cooling tower, such as: aluminized zinc plate, stainless steel plate, FRP and other materials. Therefore, the cost should be considered when purchasing. Let's take a detailed explanation of the skills and requirements of the cooling tower purchase:

       1. Select according to the cooling fluid.

Some cooling fluids have certain corrosiveness, and therefore, the material of the purchase of the cooling tower and the chemical reflection of avoidance and cooling fluid. Aluminized zinc plate and stainless steel are very prominent, service life, can be adapted to different environmental and use requirements;

       2. Cooling ability should be matched to applicable requirements.

Because the cooling tower has a certain cooling ability, it is not possible to save costs, and the actual cooling capacity of the selected cooling equipment does not meet the work requirements, then this will cause cooling and affecting safety production;

       3. Fan selection

The fan is an important device for controlling the amount of cooling tower, but the noise impact of the cooling tower fan is the factor to consider. When the cooling tower is purchased, the fan should select the power suitable big wind page and low speed fans. The blade is large, ensuring the air volume, so it can reduce the fan of the fan of the fan, thereby effectively reducing the impact of the noise caused by the fan;

       4. Motor purchase

The motor has a better insulation, the start-stop performance is well controlled, and the operation is stable. For partial cooling tower, the reducer is not used, so the motor purchase must strictly control, and the most suitable motor level is high, mainly to ensure smooth operation of the equipment;

       5. Cooling capacity cannot be judged by the tower volume.

The cooling tower is usually designed compacted because the pool is designed at the bottom. But in order to highlight the cooling capacity of the cooling tower, some manufacturers have adjusted in the design of the tower body. It is a compact equipment structure, which is large, improves visual sense, causing a more cooling ability.

       6. To view relevant qualifications

Jincheng air conditioner focuses:

Industrial air conditioning, chemical fiber industrial air conditioning, chemical fiber industry refrigeration, textile industrial air conditioning, dust-free workshop cooling, ventilation pipeline, cooling tower, freezer and other air conditioning units and accessories.

Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. is a comprehensive manufacturer of special air-conditioning equipment design, production, installation, and commissioning of clean room, electricity, tobacco, civil air defense engineering, medical clean room, clean room, electricity, tobacco, civil air defense engineering, medical clean room. Mainly produce JCZK combined air conditioning unit, cooling tower, glass steel ventilated galvanized sheet pipe, stainless steel pipe, polyurethane ventilation pipe and air conditioning accessories, Jincheng air conditioner is wide, the type, the unique model, superior performance, and user Favused.


Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術支持:中國丙綸網(wǎng)